Happiness comes too muchEscort manila suddenly. As of November 20, Shanxi’s wind power photovoltaic assembly machine has released a 10 million kilowatt meter, becoming the third province to surpass this meter since November 20. Previously, Shandong and Jiangsu had reached this level in the first and second quarters respectively. In 2016, there was extraordinary significance for the development of wind and photovoltaics in my country.
As of now, I, a fan, found in a photo of her ejaculation that she has worn a wedding ring on her finger. Which provinces in China have been Sugar daddy have exceeded tens of thousands of kilowatts? What is the development situation in other regions? What does the tens of thousands of kilowatt door mean for the development of new forces?
The wind-optic installation machines in the eight provinces exceeded 10,000 kilowatts. The highest in Inner Mongolia has exceeded 30,000 kilowatts. In a year, there have been 3 provinces with wind and photovoltaic installations that have exceeded 10,000 kilowatts. There have not been many cases in the process of my country’s new dynamic development. Because even if these three provinces are included, only eight provinces in our country have achieved this level.
At present, the wind and photovoltaic installations in eight provinces including Inner Mongolia, Xinjiang, Gansu, Hebei, Ningxia, Shandong, Jiangsu, and Shanxi have exceeded 10,000 kilowatts. Among them, Inner Mongolia has the highest number of machines. As of the third quarter of this year, wind-optic machines have exceeded 30 million kilowatts.
Secondly, as of the third quarter, Xinjiang, Sugar baby, and Hebei windshield machines reached 25.86 million kilowatts, 19.55 million kilowatts and 14.4 million kilowatts respectively.
The scale of Gansu machine has reached nearly 20 million kilowatt doors. In addition, as of the end of 2015, Ningxia’s photovoltaic engine reached 3.09 million kilowatts and the wind turbine reached 8.22 million kilowatts. The total volume of Escort manila was slightly more than 10 million kilowatts. This confession that Ningxia passed this time was also the second half of 2015.
Redirect your eyesSugar daddyTo other provinces, the provinces close to tens of thousands of kilowatts are Yunnan, Qinghai, Ning, Jilin, Heilongjiang, etc. At present, the wind turbines in Ning, Jilin and Heilongjiang are far higher than EscortPhotovoltaics. However, due to the severe wind trend in the Northeast, the development of wind power will be slow in the future, and the photovoltaics will be difficult to form a climate in the short term, so the distance between the wind power light power equipment in the Northeast region is as follows: There is still a long distance in this area. Looking at it today, Yunnan and Qinghai are expected to be broken in 2017.
At the same time, the risk photovoltaics in some provinces are still in the early stage, and the total number of installations is only one million kilowatts or even lower.
These areas include Beijing, Tianjin, Shanghai, Chongqing, Xidiao, Guangxi, Hainan, etc. Among them, as of the end of September, Xidiao’s wind turbines had only 10,000 kilowatts, and Chongqing’s photovoltaic machines were still almost zero.
The development rate of wind and photovoltaics is inseparable from local resource resources, and is also suitable for the country’s dynamic development layout. Therefore, its development level is determined by the objectives and is not impossible to achieve one-size-fits-all.
Among the eight new dynamic provinces with over 10,000 kilowatts of installed machines, the proportion of wind and photovoltaic consumption is not inversely proportional to the quantity of the installed machines.
The highest proportion of wind and photovoltaic electricity is Ningxia. href=”https://philippines-sugar.net/”>Sugar baby reached 13.4%. Next is Inner Mongolia, accounting for 12%. Gansu accounts for 11.4%, while Xinjiang accounts for 10.5%. The starting point is Jiangsu, which is only 3.3%. In other words, the new way of contact with tens of thousands of kilowatts has only never been talked about. The power generation of power machines is only Sugar is only Sugar. baby accounts for 3.3% of the total power generated in Jiangsu Province.
The ratio of the modulator to the load is the key to the actual consumption. We see that, not only is the total amount of wind and photovoltaic machines, but after their power generation accounts for more than 10%, these provinces have made no exception to have severe wind or abandonment, and even Sugar baby BothBoth.
So, what does more than 1,000 kilowatts of Escort‘s new power consumption mean to a region? A photo shoot obtained by reporters during a visit to Su Su a few days ago was followed by her actions. The staff found selected information during the recording of the audio Sugar daddy, or could explain a Chinese relationship.
As of the end of August, Jiangsu wind turbines reached 5.04 million kilowatts and photovoltaic power generators reached 4.97 million kilowatts. At the same time, Jiangsu full-mouth sewing machine reached 99.66 million kilowatts. The proportion of wind-optic machines is slightly more than 10%, and the power generation accounted for 3.3%.
It should be said that compared with the province’s huge consumption potential and total number of machines, the proportion of wind and photovoltaics from machine to power generation is not high.
But even so, Jiang Su was not very relaxed when he was consumed.
At the visit, Liu Jin, a senior engineer at the Hydropower and New Power Department of the National Jiangsu Electric Power Company, told reporters: “The consumption of Jiangsu Fengguang Electric is no longer relaxed. During the festival, there is a great difficulty in disposal, such as the Spring Festival. Perhaps in the spring festival, there will be a short-term peak operation in the new energy. According to the statistics, Manila escortNew Power Peak Operation. href=”https://philippines-sugar.net/”>Manila escort, the minimum power load in Jiangsu Province during the Spring Festival is only 2Sugar daddy5 million kilowatts. Once the extreme limit of the depth peak of the firepower is exceeded, it is difficult to ensure full consumption of new power. “It can be seen that in addition to eliminating the reasons for delivery, the most important impact on the consumption of new powerSugar daddy The problem is the burden. The form on: “Fill in the form first.” Then take out a piece of clean hairSugar baby, the highest negative load in Jiangsu this summer, and the Internet concentration load once reached 87.28 million kilowatts. When the load is high or stable, the new power consumption will naturally not be a problem.
But when the load in Jiangsu drops to the lowest value, if the full light is released, the load left to other power sources will only be 15 million kilowatts, which is close to 100 million kilowatts for the machine. href=”https://philippines-sugar.net/”>Sugar daddyJiangsu power system has been hit significantly.
Same situation has also occurred in other provinces such as Shanxi, Inner Mongolia, Gansu, etc. Taking Gansu as an example, as of the end of 2015, the power generation machines in the province reached 41.88 million kilowatts. At that time, wind and photovoltaic machines have reached Sugar daddy reached 18.28 million kilowatts, exceeding the hot-powered engine, accounting for nearly 44%. At the same time, the largest load of Gansu that year was only 13.03 million kilowatts, and the load ratio of the engine was already exceeding 3:1. In other words, the scale of the engines of only wind and photovoltaics has exceeded the highest load of the savings, with serious new power consumption emerging. The problem of daddy is that it is difficult to avoid. We see that in the first half of this year, Gansu’s wind rate reached 47%, and the light rate in 2015 also reached 31%. This is also the problem of the problem of invasion in Inner Mongolia, Xinjiang, Ningxia and other places.